Showing posts with label Housing - Renovation. Show all posts
Showing posts with label Housing - Renovation. Show all posts

Tuesday, June 4, 2013

Mini-Renovation Part 1

I guess it was a losing battle to fight the onslaught of global warming and my dear decided to fight against her fear of the ceiling fan falling down instead. As such, we went on our usual elaborated research for the ceiling fan to be placed in our living room.

The fan model was initially inclined towards Franco, however, the high quality of KDK seemed to permeate through the comments of the forumers and as such, behold our newest member of the family...

The KDK fan from Ban Kim Chuan

The installation was done amazingly quick and all was done within an hour. Unfortunately, we had to remove our beloved dining lights for aesthetic and functionality reasons. My dear somehow can live with that. My only peeve was the indiscriminate drilling in the ceiling by the installer, which resulted in an additional unnecessary ceiling hole. And he did not even attempt to patch it up. Luckily it was hidden from view by the casing. I just hope that nothing will happen due to that hole.

Though we were $400+ poorer but our room was much cooler. So far so good...

Tuesday, December 4, 2012

Updates on Renovation 16

After a delay of a few months (due to work commitments), the installation of the blinds and the poles hanger are finally done. Yet another proud production by none other than me myself. Actually, this doesn't really qualify as a renovation item, but well, it was still an improvement to our house. 

The blinds

The poles hanger

The blinds were bought from Ikea and the poles hanger were left behind by the previous owner. And the only thing left to install them was to drill holes into the walls and ceiling. Ever since my first drilling of a hole in the house, I realised that one can never underestimate the skill of a craftsmen. After all, how difficult can hole drilling be right? Big mistake. After many trials of ugly holes marks and long hours of noise pollution, I can only say that I had improved but not master it. Till now, I still need to take at least 40 minutes for one 1-inch deep hole. Perhaps I should be comforted by the fact that I paid good money for the good concrete walls in our house.

Anyway, I guess I can finally declare that the house will remain in the present state for many years to come. At least until the next renovation, which probably will not happen =)

Sunday, April 1, 2012

The Lock Story Part 3

Almost forgot this until I reread some of the older posts.

The last part was with regards to the lock of the letterbox. The changing of the lock was simple, but I did not do it correctly the first time round. The lock was installed wrongly such that the key cannot be taken out when the letterbox was locked. Thus, the letterbox was left unlocked for quite a number of days. Luckily for us, the door held on quite firmly even when it was unlocked.

The problem was rectified during the second time after some logical thinking. However, I have to get used to the fact that locking means turning away from the edge, while unlocking is the other way round, which was not inherently intuitive, which also explains why the lock was installed wrongly the first time.

Anyway, with the fixing of the letterbox lock, all our locks are finally done! =)

Updates on Renovation 15

Finally, I can declared that this shall be the last (or one of the last) update on our renovation for it can be said to be finally done.

During the first visit, the carpentry workers completed the lamination of the extra worktop. They could have finished the installation but they realised the support for the worktop was insufficient, thus they came back on another day. Anyway, they had to replace one of the cabinet doors for the lamination was budging for that door. I was rather unsatisfied with one portion of the worktop but I guess I eventually gave in for any delays in the completion was tiring for us.

During the second visit, the extra worktop was installed and the legendary backsplash was up as well. It turned out to be very nice as I was not expecting it to be one piece. Some how in my mind, I was thinking that it will be 3 pieces combined together.

The extra worktop

The legendary backsplash

The backsplash with the lights

However, the funny thing was that our contractor did not pursue us for the final payment when all these while, she kept messaging me to remind me about my payment. I guess I will contact her to wrap the entire renovation.

Thursday, March 15, 2012

Updates on Renovation 14

The plumber came again for the last time to fix up the sink and the shower taps. He also came down to fix up the bathroom accessories. This time round, my dear was the main person supervising and directing the plumber as I was busy in school trying to clear my file checking. Xin ku ni le dear. And as what my dear said, it turned out very nice.

The sink reunited with its tap

The washing machine tap

The common toilet view 1

The common toilet view 2

The MBR toilet

At the same time, another worker was doing the chemical wash of the house. He will be coming in again to patch the grout of the tiles.

Also, the air con pipes finally had its covering, after many repeated reminders to the contractor.

The not so ugly air con pipes

Updates on Renovation 13

Actually the installation of the kitchen cabinet started in the middle of the installation of the lights, but I guess it makes more sense to talk about them in their respective categories.

Much of the work was done at the factories out of our sight, where the cabinets and cabinets door were fabricated. This took quite a number of days and added to our frustrations as the progress was not visible and we were irritated by the poor coordination by our contractor. However, once the fabrication was completed, the installation of the cabinets were rather quick. In fact, the carpentry workers only came twice and they needed to come a third time because there was a mistake with the colour of one of the laminate for the worktop. The workers were also very friendly and chatty. My dear was amazed by their skill of cutting the wood without precise measurements and yet that piece of wood was able to fit nicely into its designated place.

Anyway, let the pictures show you the transformation:

Day 1 of carpentry work (front)

Day 1 of carpentry work (sink) 

Day 1 of carpentry work (stove) 

The cabinet doors

Unknown wood
(later found out to be the extra worktop)

Day 2 of carpentry work (front)

Day 2 of carpentry work (stove) 

Wednesday, March 14, 2012

Updates on Renovation 12

After the painting of the house was done, the next stage was with regards to the installation of the electrical components. This was the electrician's fourth visit to the house: the first was to remove the original casings for the plastering of the walls; while the second and third was to install the electrical casings, sockets and lights. Well, as there were some disputes with regards to his choice of placement of the sockets, his fourth visit would be one when one of the owners was around. This time, he installed all the lights in all rooms and completed the sockets in the kitchen. He also made the changes which I requested to some of the electrical sockets, though quite unwillingly.

MK brand of switches (the fake Lagrand)

The gap between sockets and OpenNet which I do not want

Maybe because of the disputes during his third visit, he seemed very aloof and did not want to talk to me when I first saw him during his fourth visit. Perhaps the other workers were too chatty such that in comparison, he seemed so distant. Hmm, maybe that's his personality.

Anyway, the pictures shall speak for themselves:

Lights in living room

Lights in study

Lights in other bedroom

Lights in storeroom

Lights in MBR

Lights in MBR toilet

Lights in kitchen

Lights in common toilet

Lights in service balcony

Lights in "balcony"

The Lock Story Part 2

After settling the locks of the rooms, the next task was to engage a locksmith to remove the existing main door lock and door viewer as I could not remove them as I feared damaging the door. Only when I saw how effortlessly the locksmith removed the main door handle that I realised that all I need was just a screwdriver and some guts to knock out the handle. However, the $60 was indeed worth it because the door viewer was a hard nut to crack and eventually it was removed though with some damages to the door. But the door viewer was not installed until the painting was done.

Main door handle (front)

Main door handle (back) 

Well, I must say the locksmith's service was quite good and professional. He was also quite friendly too. His name is Peter Teo and he said that he does renovation too.

The next lock to be installed was the gate lock and even though the original handle was brought to the shop, there was some misalignment and I had to DIY by drilling the aluminium gate. I guess the electric drill from Ikea and the round file from Yiap Heng Cheong were good investments and soon the job was completed.

Gate handle (front)

Gate handle (back)

And that leaves only the mailbox lock to be changed before the conclusion of the lock story.

Tuesday, March 13, 2012

The Tap Story

On hindsight, this incident can be quite humourous, though it came as a shock at the start. Well, it began with us naively thinking the shower set had everything inside and thus when it came to the installation of shower set and the plumber asked us for the tap to connect to it, we were stunned that we overlooked the purchase of the shower tap.

As such, we went back to the same store and we chanced upon this tap which we both like, thus we requested for two of it. The ominous sign first came when the salesperson gave us one of the correct brand and another of another brand. Next came the bad news that there was only one tap left and he asked us to wait till next week. We thought nothing of that until the next visit saw me making a futile trip and the salesperson mentioned that it will only arrive two weeks later. Sadly to say, time did nothing to change the unavailability of the tap and in the end, I opted for the display set at a reduced price.

The nice two-way tap
(Universal Union Enterprise)

The next tap that we missed out was the washing machine tap, to which the plumber used his own. I was alright with it though my dear prefer a nicer looking one.

The simple tap supplied by the plumber

Thus, that's the end of my tap story.

Monday, March 5, 2012

The Lock Story Part 1

As our contractor had no liaison with any locksmith, we had to look for one ourselves. And so we (at least me) were back to searching the forum for a contact. Luckily for me, the forumers were very helpful and I soon got one contact, which I eventually used, but that shall be said in Part 2.

Prior to meeting the locksmith, we decided to buy the locks ourselves. Once again, we were visiting the forums to see which hardware store offer us the best deal. I detached the handle from the gate so that it was easier to buy a replacement. Only when I reached the first hardware store did I learn from the store employee that they need a picture of the side of the lock in order to recommend a suitable lock. As such, the photos below:

The gate before operation

The gate after operation (front) 

The gate after operation (side)

The gate after operation (back)

The main door (front)

The main door (side)

The main door (back)

Anyway, we did the locks of the rooms' doors first. The main reason why we need to do that was because one of the locks had a problem with its keys and thus it needed to be changed. And because if one lock was changed, the others need to be changed as well for the uniformity in the look. Anyway, it was an interesting but frustrating DIY experience. For the first door I did, I damaged the top of one of the screws for the second time, just simply because I was stingy enough to reuse the screw when it was already slightly damaged. Lesson learnt: never reuse damaged screws or they will screw you back. Of course, the other lesson learnt was that I need to drill a hole as long as or longer than the screw itself, or else I will end up with a damaged screw.

So what did I do with the damaged screw? As the screw was only halfway in, I had to drill through the screw in order to remove it, which happened to be a slow and excruciating process. Luckily hard work pays off and the offending article was subsequently removed and taken care of. The end result? A nice door knob which my dear likes =)

The door handles
(Shanghai Tong Lee Hardware)

The screwed screw

The end result

Bedroom door lock (front)

Bedroom door lock (front) 

Tuesday, February 28, 2012

Updates on Renovation 11

I was surprised at how fast the painting was done in one day.

I was doubly surprised at how fast the window films were taken off, when both me and my dear actually took so many hours just to remove one or two. Guess there is a reason why they are the professionals.

I was triply surprised when the main door was painted the next day as I did not had time to remove the door latch beforehand. Guess we have to wait till the end of the renovation before the door can be painted nicely.

The living room with its white walls 1

The living room with its white walls 2

The MBR with its white walls 1 

The MBR with its white walls 2

The study with its white walls

The other bedroom with its white walls

The storeroom with its white walls

The kitchen with its white walls 1 

The kitchen with its white walls 2

The service balcony with its white walls 

The "balcony" with its white walls

The greyish white door 1

The greyish white door 2