Monday, March 5, 2012

The Lock Story Part 1

As our contractor had no liaison with any locksmith, we had to look for one ourselves. And so we (at least me) were back to searching the forum for a contact. Luckily for me, the forumers were very helpful and I soon got one contact, which I eventually used, but that shall be said in Part 2.

Prior to meeting the locksmith, we decided to buy the locks ourselves. Once again, we were visiting the forums to see which hardware store offer us the best deal. I detached the handle from the gate so that it was easier to buy a replacement. Only when I reached the first hardware store did I learn from the store employee that they need a picture of the side of the lock in order to recommend a suitable lock. As such, the photos below:

The gate before operation

The gate after operation (front) 

The gate after operation (side)

The gate after operation (back)

The main door (front)

The main door (side)

The main door (back)

Anyway, we did the locks of the rooms' doors first. The main reason why we need to do that was because one of the locks had a problem with its keys and thus it needed to be changed. And because if one lock was changed, the others need to be changed as well for the uniformity in the look. Anyway, it was an interesting but frustrating DIY experience. For the first door I did, I damaged the top of one of the screws for the second time, just simply because I was stingy enough to reuse the screw when it was already slightly damaged. Lesson learnt: never reuse damaged screws or they will screw you back. Of course, the other lesson learnt was that I need to drill a hole as long as or longer than the screw itself, or else I will end up with a damaged screw.

So what did I do with the damaged screw? As the screw was only halfway in, I had to drill through the screw in order to remove it, which happened to be a slow and excruciating process. Luckily hard work pays off and the offending article was subsequently removed and taken care of. The end result? A nice door knob which my dear likes =)

The door handles
(Shanghai Tong Lee Hardware)

The screwed screw

The end result

Bedroom door lock (front)

Bedroom door lock (front) 

Tuesday, February 28, 2012

Updates on Renovation 11

I was surprised at how fast the painting was done in one day.

I was doubly surprised at how fast the window films were taken off, when both me and my dear actually took so many hours just to remove one or two. Guess there is a reason why they are the professionals.

I was triply surprised when the main door was painted the next day as I did not had time to remove the door latch beforehand. Guess we have to wait till the end of the renovation before the door can be painted nicely.

The living room with its white walls 1

The living room with its white walls 2

The MBR with its white walls 1 

The MBR with its white walls 2

The study with its white walls

The other bedroom with its white walls

The storeroom with its white walls

The kitchen with its white walls 1 

The kitchen with its white walls 2

The service balcony with its white walls 

The "balcony" with its white walls

The greyish white door 1

The greyish white door 2

Furniture Shopping Spree 6

Guess the trend is that we are going back to the same place to buy more stuffs, for example like our wardrobe and side table. I think we have gone back there like at least 4 or 5 times? So much so that the staff recognised us quite easily. Actually, it was also probably because she was so nice and sincere that we went back to her. Burnt more holes in our pockets by purchasing our wardrobe.

The bedside table
(CNA Furniture Trading Enterprise)

The bed frame which was bought previously
(CNA Furniture Trading Enterprise)

The wardrobe
(CNA Furniture Trading Enterprise)

Of course, in order to fully utilise our time, we also arranged to confirm the colour for our sofa ordered last year. Actually, it was the other way round, as it was because the appointment for confirming the colour was on this day, that's why the purchase of wardrobe is on this day. Lol.

The colour for the sofa cover

The colour for the small cushions

To further utilise our time, we proceeded to Ikea to source for some ideas. We did not buy much as we were running out of the space to store them prior to the completion of our house.

The picture frame idea from Ikea

The happy dear

Tuesday, February 21, 2012

Updates on Renovation 10

In the end, we did not get a drawing of kitchen from Lina, despite numerous reminders from us. There was an email from her but it came without the attachment of the designs. She mentioned that she stayed up all night to do it and there was probably some technical difficulties, but somehow I was not convinced. On the day of the meeting, her husband Amos came instead to take down the measurements and also the orientation of the cabinet doors. I guess that sort of sealed the fate that there will probably not be any drawings of the kitchen made, which was found to be true. Maybe I was too easy to be pushed in that sense. Anyway, we also chose the laminates for the kitchen cabinets and the extra worktop, though the fate of the solid worktop remained hanging until its samples came to our view, which till now, we are still waiting for.

The laminate the worktop

The laminate for the kitchen cabinets

Nevertheless, the plastering of the house continued to be done very smoothly. Meanwhile, the WC, the basin and the water heaters were installed. The plumber called me in the day when I was at work to enquire about the placement of the basin for the MBR. I guess these things cannot be discussed over the phone as I could not really visualise how it looked. As such, even though the plumber did as what I instructed, I was quite displeased with how the basin turned out, as the slight misalignment off the centre seemed to make the placement of the basin look ugly. I gave my feedback to Lina to realign the basin to the centre of the depression of the wall, but it was not done the next day. This was the second time in which I wanted a change but the message was not conveyed to the subcontractors. However, my dear thought that it looked alright (even though initially she was quite upset when she first learned that it was not aligned to the centre and insisted in the change also), and thus I told Lina to retain the position of the basin so that there will not be additional holes made in the walls.

At the same time, I was actually taken aback when the plumber informed me that there wasn't a tap for the shower as it was something which I had not considered as I thought it was included in the shower set. Quite a big boo-boo for me, thus we decided to make a trip down over the weekend to buy the tap.

After which, the kitchen doors were installed and the house was left empty for a day so as to allow the plaster to dry before the painting.

Anyway, enjoy the pictures! =)

Plastering of the other bedroom 1

Plastering of the other bedroom 2

Plastering of the other bedroom 3

Plastering of the study room 1

Plastering of the study room 2

Plastering of the study room 3

Plastering of the study room 4

Plastering of the storeroom

Plastering of the balcony

Plastering of the living room 1

Plastering of the living room 2

Plastering of the living room 3


Plastering of the service balcony 1

Plastering of service balcony 2

The incomplete common toilet

The completed common toilet 1

The completed common toilet 2

The completed MBR toilet

The sliding doors (from kitchen)

The sliding doors when opened

The sliding doors (from living room)

Sunday, February 19, 2012

Updates on Renovation 9

Our contractor had been quite forgetful and perhaps that resulted in the slow progress of the renovation. We are still waiting for her designs for the kitchen cabinets. Also, the WCs and basins are not installed yet. However, the plastering of rooms are going quite smoothly (pun intended).

The smooth walls of the MBR

The smooth walls on the other side of the MBR

Hope her designs are to our liking.