Our contractor had been quite forgetful and perhaps that resulted in the slow progress of the renovation. We are still waiting for her designs for the kitchen cabinets. Also, the WCs and basins are not installed yet. However, the plastering of rooms are going quite smoothly (pun intended).
|
The smooth walls of the MBR |
|
The smooth walls on the other side of the MBR |
Hope her designs are to our liking.
No comments:
Post a Comment