Updates on Renovation 3

Our renovation works started again this week as the workers came back from their CNY break. So far the progress and the quality was acceptable and I hope it will continue to be as smooth as possible. I only saw the workers on the first day as I am unable to be there in time before they knock off at 6pm for other days.

I guess I was intrigued by the tools used during the construction. For example:

The nemesis of all tiles - off with their corners! 

The water pipes and the long metal strips
(which I later found out are placed at the corners of walls)

Our tiles (didn't know that they need a jacuzzi before use)

The broken ones (to be used creatively by the workers)

Anyway, I shall let the pictures do the talking for the rooms.

Transformation of the MBR toilet:

Day 3: Left

Day 3: Right

Day 3: Bottom

Day 5: Left

Day 5: Front

Day 5: Right

Day 5: Bottom

Day 6: Left Bottom

Day 6: Right Bottom (with the drop)

Transformation of the common toilet:

Day 3

Day 5

Transformation of the kitchen:

Day 3

Day 5

Day 6: with edition to the drawing of the opening

Transformation of the service balcony:

Day 5

Day 6: with less sand and sharper edges

Transformation of the psuedo-balcony:

Day 5

Excited about how it will all turn out in the end =)