I guess I was intrigued by the tools used during the construction. For example:
The nemesis of all tiles - off with their corners! |
The water pipes and the long metal strips (which I later found out are placed at the corners of walls) |
Our tiles (didn't know that they need a jacuzzi before use) |
The broken ones (to be used creatively by the workers) |
Anyway, I shall let the pictures do the talking for the rooms.
Transformation of the MBR toilet:
Day 3: Left |
Day 3: Right |
Day 3: Bottom |
Day 5: Left |
Day 5: Front |
Day 5: Right |
Day 5: Bottom |
Day 6: Left Bottom |
Day 6: Right Bottom (with the drop) |
Transformation of the common toilet:
Day 3 |
Day 5 |
Transformation of the kitchen:
Day 3 |
Day 5 |
Day 6: with edition to the drawing of the opening |
Transformation of the service balcony:
Day 5 |
Day 6: with less sand and sharper edges |
Transformation of the psuedo-balcony:
Day 5 |
Excited about how it will all turn out in the end =)
No comments:
Post a Comment