Monday, February 13, 2012

Updates on Renovation 7

Hmm, more progress on the tiling of the balcony and service balcony, but the workmanship seemed to be poorer than the previous two weeks. The tiles for the service balcony were like cut to weird sizes, not sure if it can be seen from the photo. The water piping seemed weird also as it seemed to run through quite a number of places.

Flooring of balcony

Flooring of service balcony

Water piping at bottom of MBR toilet

Water piping at top left of MBR toilet

Water piping at bottom left of MBR toilet

Water piping at bottom of common toilet

Water piping at top of common toilet

Water piping at kitchen

The dented piping which I think need to be changed